New award for the supply and installation of an economizer bench for the steam generator of the UL1 plant (Terni) – ACEA SPA.
In October, Europower was awarded the supply and installation of a new economizer to be installed during the next maintenance stop of the plant owned by ACEA SpA in Terni. The economizer will be perfectly interchangeable (dimensionally and functionally) with the existing one.
The contract will take place entirely in 2021.