Ansaldo Energia in partnership with AC Boilers has been awarded the contract for the design, engineering, manufacturing, supply, erection and commissioning of the 800 MW “Power Train” of Edison Marghera Levante (Venice) Combined Cycle Power Plant, that will be the most efficient in Europe.
The order includes the supply of an H Class Gas Turbine GT 36, the HRSG (supplied by AC Boilers) of the 3 pressure levels plus RH type and the 250 MW Steam Turbine associated.
The scope of supply also includes the system for the abatement of NOx (SCR) in order to comply with emission limit values stated in the legal authorizations of this project.